Project - Leicester Cathedral

Posted by John Robinson on Jun 2, 2023 5:00:03 PM
John Robinson

IMG_0372   20220801jpw_144628 

Contract: Leicester Cathedral.

Equipment: Tube & Fittings + 450 Alu Beams

Design Brief: 

To provide a fully boarded access scaffold to the south wall for stonework repairs. The top lift was to be encapsulated with Monarflex sheeting to provide weather protection to the top lift & extended out over the parapet wall. A bridged section was required to provide access over the main entrance, with a drop scaffold from beams positioned above the top boarded lift to give access at the correct level.

Drg 01-1

Drg 02-1

 

Topics: Scaffold Design, TG20:21, NASC, Access, Bridged