Topics: Scaffold Design, TG20:21, Temp Roof, Access
Topics: Scaffold Design, TG20:21, Temp Roof, Access
Contract: Northampton General Hospital.
Equipment: Tube & Fittings with 750 Alu Beams and Ubix 450 Deep System Roof.
Design Brief:
Provide design drawings for a full access scaffold and Ubix temporary roof over the Willow Ward at Northampton General Hospital. Complicated by having to bridge over adjacent and adjoining buildings and limited opportunities to tie to the main structure.
Topics: Scaffold Design, TG20, TG20:21, NASC, Temp Roof
Contract: Edgbaston, Birmingham – £85m development of 375 apartments.
Equipment: Tube & Fittings with Pre-fabricated Transom Units + Alu Beams + Sheeting
Design Brief:
Provide design drawings for a full access scaffold with loading bays and high load hoist run-offs for this new building residential accommodation complex in central Birmingham.
Topics: Scaffold Design, TG20, TG20:21, NASC, Temp Roof
Contract: Aston Hall, Aston Munslow – Grade II listed, stone and brick built manor house.
Equipment: Tube & Fittings + Alu Beams + Sheeting + UBIX System Roof
Design Brief:
Provide design drawings for a temporary roof and side protection over a former manor house. To be free standing with kentledge or anchored to ground.
Topics: Scaffold Design, TG20, TG20:21, NASC, Temp Roof
Contract: Oxford University Press – Stone University Building. Built 1826-1832
Equipment: Tube & Fittings + Alu Beams + System Roof
Design Brief:
Provide design drawings for a temporary roof to provide weather protection and access scaffold to the stone university building. Supporting scaffolds to be founded on grounds and bridged / cantilevered over the perpendicular parts of the building.
Topics: Scaffold Design, TG20, TG20:21, NASC, Temp Roof