To provide a fully boarded access scaffold to the south wall for stonework repairs. The top lift was to be encapsulated with Monarflex sheeting to provide weather protection to the top lift & extended out over the parapet wall. A bridged section was required to provide access over the main entrance, with a drop scaffold from beams positioned above the top boarded lift to give access at the correct level.